The invention relates to a loading double bed plate shipway.
本发明涉及一种载重型双底船台。
This paper introduces the working course and key points which let a V-bottom ship up to shipway with air-bag.
通过实例,介绍了V形底船气囊上排的实施过程和操作要点,以及上排过程中出现问题的处理方法。
Under a traditional installation method a shafting is first mounted on a shipway and after a launching, the shafting undergoes an alignment through the adjustment of a main machine location.
传统的轴系安装方法是先在船台安装轴系,后下水通过调整主机位置进行轴系对中安装。