Is it covered in the cost estimate?
在最初的成本估算时将它算在内了吗?
A rough cost estimate for a solution.
对解决方案的粗略成本估算。
C. To get a better cost estimate.
为了得到一个较好的成本估算。
Normal cost estimate 450 a month!
一个月正常开销估计450元!
I make a cost estimate.
我写成本估算单。
Table 5: Process improvement cost estimate.
表5:过程改进成本估计。
Our cost estimate was way off the mark.
我们对成本的估计太离谱了。
The cost estimate drops with income level;
这些花费将会根据收入的水平线降低。
So why is the cost estimate so much higher than Wilson's?
那么为什么马科斯和卡巴约估算的费用比威尔逊的高出这么多呢?
Specific items in the detailed cost estimate become job cost elements.
详细成本估算中的具体项次成为工作成本要素。
The return is based on the cost estimate and the potential revenue estimates. 5.
收益是基于成本估计和潜在收入估计的。
Cost budgeting-allocating the overall cost estimate to individual work items.
费用预算-总费用分配到单个工作项目上。
The project without cost estimate and benefit analysis is often out of control.
未进行成本估算和效益分析就进行软件项目开发,往往会导致项目失控。
Instead, the existing costing data is simply transferred into the new cost estimate.
改为已经存在的成本数据简单的传入新的成本评估。
Gregg promised to send us a revised cost estimate for the trip by the end of last week.
葛雷格曾答应在这礼拜之前给我们发来调整后的费用估算数字。
The budgeted cost is derived from the detailed cost estimate prepared at the start of the project.
预算本钱由项目初始阶段的具体成本估算得来。
And carries on the cost estimate, the budget and the control to the morning star company's ERP project.
并对晨星公司的ERP项目进行成本估算、预算及控制。
His cost estimate was way off base, far higher than warranted by current prices for labor and materials.
他的成本估计太离谱了,不合理地远远高于目前劳力和材料的价格。
You can now use the SQL outline again to see that the cost estimate is reduced just by doing this simple task.
现在您可以再次查看 SQL 大纲,您将看到,成本估计降低了,这仅仅是因为执行这个简单任务。
Generally, the accuracy of a cost estimate will reflect the information available at the time of estimation.
总的来说,估价的准确程度将反映估价时所获取的信息。
For materials in collective requirements, the existing cost estimates are transferred into the new cost estimate.
对集中需求的物料,已经存在的成本核算数据被传递到新的成本核算中去。
However, in order to get the best cost estimate, the optimizer needs the values that will be used when the query executes.
然而,为了获得最佳的开销评估值,优化器需要获得查询执行时使用的值。
The cost estimate for those SITEs would be delivered to OPERATOR within 5 business days following the actual SITE visit.
承包商必须在实地勘测站点后5个工作日内提交工程的成本估价给运营商。
Research on software support cost estimate model is important to the precision and efficiency of software cost estimate.
软件保障模型估算的研究对提高软件保障费用估算的精度和效率有重要意义。
This article uses the COCOMO II method, becomes the case to the domestic software development cost estimate aspect which may refer.
本文的意义在于使用COCOMO II 方式,对海内的软件开发成本估算方面成为一个可参考的案例。');
First this thesis supplies that the accuracy of cost estimate and the level of mark-up are important in the bidding process by ana.
本文首先通过分析竞争性投标中标价的构成和影响中标的因素,指出了成本估价的准确性和标高金的水平在投标中的重要性。
In terms of the strategies of price, the outcome will be brought to light through the analysis of the cost estimate of commercial houses.
在价格策略方面,主要是通过对商品房的成本构成分析,制定出工农路九号住宅小区商品房的定价目标、定价方法、定价策略等价格策略。
Converting a final cost estimate into a project budget compatible with an organization's cost accounts is not always a straightforward task.
把最终的成本估算转化成与组织的成本报告兼容的项目预算并不是一项简单的工作。
Software cost estimate with the traditional experience function has the shortcoming, and applying CBR estimate method can make up these problems.
用传统的经验函数估算软件成本有很多局限性,采用基于范例库推理的估算方法可以很好地弥补其中的问题。
This staffing model (or "map" if the word "model" sounds too formal) will provide input to the overall cost estimate by establishing timing for the costs.
这个人员配备模型(如果“模型”这个词听起来太正式,可换成“图”)将通过对成本适时的评估提供所需的全部成本评估。