查询
1 词典释义:
cil
时间: 2025-03-30 05:48:32

电立入逻辑

双语例句
  • Is there a generic CIL code to convert any type instance to string?

    有一个通用的CIL代码转换成任何类型的实例的字符串?

  • With CIL, the code that is in the executable file is not actually executed.

    与CIL代码不实际执行的可执行文件。

  • I think you're confusing how executing CIL works with how executing native code works.

    我认为你混淆执行CIL的工作方式与执行本机代码是如何工作的。

  • The method and result of leaching of gold ore heap bio oxidation cyanidation CIL process was introduced.

    介绍了难浸金矿石堆式细菌氧化—氰化炭浸提金的基本试验方法和结果。

  • Jim Purbrick of LindenLabs built a continuation system that uses CIL rewriting instead of runtime suppport.

    来自LindenLabs的Jim Purbrick构建了一个continuation系统, 使用CIL进行了重写而非运行时支持。

  • As figure 4 illustrates the HTTP call is translated into a HTTPCommand object in the.net based OnCast CIL library.

    图4中所展示的http呼叫在基于。NET的OnCast CIL库中,被转换为HTTPCommand对象。

  • NET code is compiled not into native code, but into an intermediate language imaginatively called CIL (Common intermediate language).

    NET代码不会被编译成本地代码,而是转换成为一种可以称为CIL(公共中间语言)中间语言。

  • By keeping the integration as thin as possible, a plugin crash will not take down the OnCast CIL services running on a client computer.

    使集成保持尽可能的松耦合,那么一个插件的崩溃将不会影响客户端电脑上运行的OnCast CIL服务。

  • It can then trigger a CIL Command which causes the OC CIL client to communicate with the MAP Server to perform operations like initiating a call.

    随后这将触发一个CIL命令,从而导致OC CIL客户端与MAP服务器的通讯,执行如初始化呼叫的操作。

  • This paper discussed the technology, operation conditions and practical experience of CIL process used in the floatation of gold-bearing sulphide concentrates in the Jilin gold Mine.

    本文论述了氰化炭浸法提金工艺应用于吉林市金矿浮选含金流精矿的生产工艺过程、作业条件和实践经验。

  • Unfortunately, CIL is statically typed and as I alluded to in my introduction, this is where the DLR comes in to enable interoperability between the CLR and dynamic languages such as Ruby.

    不幸的是,CIL是静态类型语言,不过,正如我之前在介绍中提及的那样,这就是DLR如何能够提供CLR和例如Ruby这样动态语言交互能力的关键所在。

  • All major federations of coal workers will go on a country-wide strike on October 10 after talks on bonus and exgratia and coverage of all contract workers failed with coal India Ltd (CIL).

    所有合同工人在与印度煤炭公司就奖金问题谈判失败后,全国主要联邦的煤炭工人将于10月10日在全国范围内进行罢工。